Thursday, 11.28.2024, 2:46 AM
Home Sign Up RSS
Welcome, Guest
Site menu
Our poll
Rate my site
Total of answers: 1
Statistics

Total online: 9
Guests: 9
Users: 0
Log In
Search
Calendar
«  January 2010  »
SuMoTuWeThFrSa
     12
3456789
10111213141516
17181920212223
24252627282930
31
Entries archive
Home » 2010 » January » 1 » SMARThivTECHS_January
5:41 PM
SMARThivTECHS_January
March 1:
 
Third month of SMARThivTECHS trials opened
 
The third month activities will focuse on exploration of PCR protocols and basic variants of ELISA technology.  

 

February 8 to 28, 2010
 
a) exploration of elisa technology variants
 
b) furhter exploration of PCR equipments
 
c) PCR and ELISA related publications moved to the Biotech tropicana, Inc GROUP Laboratory site at http://btielisablogs.inventorslab.co.za/
 
February 1 to 7, 2010
 
a) Summary of first month of pre clinical trials of the SMARThivTECHS set for publication on February 7, 2010
 
b) Survey of basic requierments of an Enzyme Linked ImmunoSorbent Assay ,ELISA, laboratory
 
c) PCR equipment survey follow up
 

SMARThivTECHS Trials
January 31, 2010
a) Publication of Part1.4 of PCR publication serie moved to February 7; 2010.
First month in SMARThivTECHS trials closed.

January 20, 2010
Preliminary images of the Biotech tropicana, Inc card board models of pcr lab published at www.btitechtrials.ucoz.com/photo/bti_pcrlab_models/4 .
The images are being processed for 3D presentation, and for legend attachment.
The abandonned truck shown is being used to simulate the mobile version, of the Biotech tropicana, Inc SMARThivPACK "three tests" HIV patients monitoring platform, for the resource poor settings: "The Mobile Life Box".

January 18-25:

Reviews of PCR laboratory equipments. Card bord simulations of equipment distribution in lab.

January 25, 2010: Part1.3 of PCR publication series, PCR equipments, set for publication.

January 18, 2010:

Major findings of works done from  January 11-18, published.  


January 11-18
 
January 11-13, 2010: Literature review for variants of PCR facilities.
 
January 14-15, 2010: Data analysis in comparative study of published work with data obtained from Biotech tropicana, Inc simulated models.
 
January 11-17,2010: Manucript preparation for part 1.2 of the Biotech tropicana, Inc PCR protocol tailored to the resource-poor settings.
 
January 18, 2010: part 1.2 of the Biotech tropicana, Inc PCR protocol tailored to the resource-poor set for publication in Biotech tropicana Journal.
 
January 10, 2010
 
Major findings from January 5-10 activities published in the Biotech tropicana Journal at http://btropicanaforum.ucoz.com/publ/
 
Projected activities for January 11-18, 2010 posted.
 
January 5-10, 2010

Simulated in house pcr lab established using card board material. Simulated lab set for manual sample preparation for pcr, based on model from Theodore E. Mifflin. Setting Up a PCR Laboratory. Department of Pathology, University of Virginia, Charlottesville, Virginia. Available at http://www.biosupplynet.com/pdf/01_PCR_Primer_p.5_14.pdf  at page 8. Accessed September 25, 2009. Trial schedule set for day 5-10 at http://btitechtrials.ucoz.com/publ .


Trial activities set for days 5-10:
 
Day_5: set up for simulated in house pcr lab as applied to automated robotic sample preparation.
 
Day_6: set up for simulated mobile pcr lab as applied to manual sample preparation. Simulated lab will bet in motor vehicle.
 
Day_7: set up for simulated mobile pcr lab as applied to automated robotic sample preparation. Simulated lab will be set in motor vehicle.
 
Day_8: image processing for 3D presentation.
 
Day_9-10: manuscript preparation for major findings for days 1-7. Reader friendly versions of manuscript set for publication in Biotech tropicana Journal
 
Days_5-10: exploration of protocols for different pcr set ups in simulated labs.
 
January 2-4
 
SMARThivTECHS Tech trials Days 2-4
 
Day 2 : January 2, 2010
Material separation
 
Day 3 : January 3, 2010
Material marking
 
Day 4 : January 4, 2010
Material assignment and imaging
 
Days 2-4: January 2-4, 2010
Protocols exploration for adaptation to particular simulation context in compliance with requirements under classical scientific methods.
 
January 01, 2009
 
Simulation trials of the SMARThivTechs lunched at 8 AM Greeenwich Mean Time. For major activities for day_1, go to http://btitechtrials.ucoz.com/publ  and http://btitechtrials.ucoz.com/photo
 
 
 
 
Happy New Year 2010
 
 
 
 
 
 

 


 
Category: SMARThivTECHS_January | Views: 391 | Added by: Biotechtropicana | Rating: 0.0/0
Total comments: 0
Name *:
Email *:
Code *: